Access information and documents pertaining to ongoing projects in the Township of Wilmot. Projects usually begin with the Environmental Assessment Phase. Once completed and approved, the project then moves into the Design Phase followed by the Construction Phase.
The content below details the relevant information and documents pertaining to ongoing projects in the Township.
Baden Trunk Sanitary Sewer |
||||||||||||||||||
Current Phase: Construction Project Details: The Baden Sanitary Sewer construction will commence early January 2025.
This will involve the installation of the Sanitary Trunk Sewer from the Foundry Street Pumping Station to the South of the CNR Right-of-Way by Charlotta Street and the culvert replacement along Gingerich Road. The sewer will be located within Foundry Street, Gingerich Road, as well as on the property owned by the estate of the late Enid and Elizabeth Schmidt (which has been acquired by Township for purposes of the Sanitary Trunk Sewer).
The construction of the Baden Sanitary Trunk Sewer provides the needed sanitary servicing infrastructure for the development lands within Baden.
The Construction for this project will be completed in three stages:
Timelines:
*these timeframes are all weather dependent.
Gingerich Road will remain open during the construction and will be reduced to one lane of traffic to accommodate businesses West of Gingerich Road. Hand delivered notices regarding the proposed construction will be forwarded to residents and business owners located within the project area as well as those who will be directly impacted by the construction. Project Files:
|
||||||||||||||||||
Bridge Street Bridge Replacement Over Nith River |
||||||||||||||||||
Current Phase: Close-out/Warranty
|
||||||||||||||||||
Brewery Street & Snyder's Road East Sanitary Repairs |
||||||||||||||||||
Current Phase: Construction Project Notes/Details: Brewery Street and Snyder’s Road East will be undergoing construction for sanitary repairs and new watermain section installation. This project will also include surface works for concrete curbs, concrete sidewalks, separated cycling lanes, road base and asphalt riding surface. Base asphalt to be completed 2024. Surface asphalt and sidewalk to be completed in 2025.
|
||||||||||||||||||
Hot Mix Paving Program |
||||||||||||||||||
Current Phase: Design Project Notes/Details: This is an annual program to repair, replace or reconstruct existing road network segments with hot mix asphalt to maintain adequate high class bituminous (HCB) surface road assets. Structure adjustments, water valve adjustments, concrete curb and sidewalk repairs will also be completed under this project. Road networks include: New Hamburg
New Dundee
|
||||||||||||||||||
Morningside Trunk Sanitary Sewer |
||||||||||||||||||
Current Phase: On-Hold Pending Region of Waterloo Environmental Assessment (EA)
Project Files:
|
||||||||||||||||||
Municipal Drain Maintenance and Capital Works |
||||||||||||||||||
|
||||||||||||||||||
New Hamburg to Baden Transmission Watermain |
||||||||||||||||||
Current Phase: Warranty Project Notes/Details: **Please Note: This is a Region of Waterloo Project, refer to their website for more information about Construction and Road Closures. |
||||||||||||||||||
Pavement Marking Program |
||||||||||||||||||
Current Phase: Closed Status: |
||||||||||||||||||
Sidewalk Repair & Replacement |
||||||||||||||||||
Current Phase: Closeout Project Details: Annual program to repair, replace deficient concrete sidewalk identified during annual sidewalk inspections. |
||||||||||||||||||
Snyder’s Road East Reconstruction |
||||||||||||||||||
**Please Note: This is a Region of Waterloo Project, refer to their website for more information about Construction and Road Closures.
Current Phase: Construction Project Files: Phasing Maps |
||||||||||||||||||
Snyder’s Road West and Foundry Street Reconstruction |
||||||||||||||||||
Current Phase: Phase 2 Construction Notice to Residents/Business Owners Project Notes/Details: The Township of Wilmot is planning to proceed with the continuation of the reconstruction of Snyder’s Road West from Foundry Street to Christian Street and Foundry Street from Snyder’s Road to Charles Street. The contractor for this project is Steed & Evans Ltd. of St. Jacobs, Ontario. Work has been split into two phases and is expected to take two full construction seasons to complete. Phase 1 of construction was completed in 2024 and construction for Phase 2 (2025) is tentatively scheduled to begin in mid to late April, weather permitting and be completed late fall. Phase 2 is to include Foundry Street from Snyder’s Road to Charles Street, and the remaining section of Snyder’s Road West from Foundry Street to Mill Street. Phase 1 (2024) included Snyder’s Road West from approximately Mill Street to Christian Street and has been mostly completed with final restoration expected to be completed this spring. Work consists of full road reconstruction including, new sanitary sewer, storm sewer, watermain, concrete curb and gutter, concrete sidewalk, concrete separated cycling lanes, road base and asphalt riding surface. Phase 2 Stage 1A starting approximately mid-April, work will be done in the Charles St. intersection first and will be temporarily restored prior to Snyder's Rd. closure. Motorists and pedestrians can expect the following:
Speed cushions will be installed in the coming weeks on some affected side streets. Please follow the posted detour signs. Stage 1B starting on or about May 5, 2025, weather permitting to October. Motorists and pedestrians can expect the following:
Please follow the posted detour signs Stage 1C starting approximately mid-July Access to Castle Kilbride will be from Wagler Ave.
Visit Snyder's Road West and Foundry Street Reconstruction | EngageWR for more information
Project Files: |
||||||||||||||||||
Township Watermain Cured-in-Place Pipe (CIPP) Relining |
||||||||||||||||||
|
||||||||||||||||||
Victoria Street and Boullee Street Reconstruction |
||||||||||||||||||
Current Phase: Construction (May 2025) Notice to Residents/Business Owners Project Files:
Project Notes/Details: The Township of Wilmot is set to commence the reconstruction of Victoria Street and Boullee Street in New Hamburg, following the recent awarding of the contract to Cassidy Construction London Ltd., based in Dorchester, Ontario. This extensive project will be executed in two stages over the course of two full construction seasons. Stage 1 (2025):
Stage 2 (2026):
The project encompasses comprehensive infrastructure improvements, including:
These enhancements aim to significantly modernize, provide capacity for growth and strengthen the area’s infrastructure, benefiting both residents and businesses owners.
Visit Victoria Street and Boullee Street Reconstruction | EngageWR for more information |
||||||||||||||||||
Wilmot Street Reconstruction Phase 2 |
||||||||||||||||||
Current Phase: Complete
Project Files: Phasing Extents Map Project Notes/Details:
|