Access information and documents pertaining to ongoing projects in the Township of Wilmot. Projects usually begin with the Environmental Assessment Phase. Once completed and approved, the project then moves into the Design Phase followed by the Construction Phase.
The content below details the relevant information and documents pertaining to ongoing projects in the Township.
Baden Trunk Sanitary Sewer |
||||||||||||||||||
Current Phase: Design Project Files:
|
||||||||||||||||||
Bridge Street Bridge Replacement Over Nith River |
||||||||||||||||||
Current Phase: Close-out/Warranty Project Files:
*Please note that the report at this point is preliminary, and is subject to revisions as the preliminary design process continues. |
||||||||||||||||||
Greenwood Drive Reconstruction |
||||||||||||||||||
Current Phase: Close-out / Warranty Project Files: Project Notes/Details: Wilmot Staff have awarded the project and have tentatively scheduled road and sewer improvements in the Greenwood Drive, New Hamburg neighbourhood. The project is funded through Canada Community Building Fund and Infrastructure Reserve Funds. The following improvements are scheduled to be completed:
|
||||||||||||||||||
Hot Mix Paving Program |
||||||||||||||||||
Current Phase: Close-out/Warranty
Status: Design Project Notes/Details: This is an annual program to repair, replace or reconstruct existing road network segments with hot mix asphalt to maintain adequate high class bituminous (HCB) surface road assets. Road networks include:
|
||||||||||||||||||
MAK Subdivision |
||||||||||||||||||
Current Phase: Close-out/Township Assumption
Project Files: Letter to Residents Project Notes/Details: As part of the Township's final assumption process, K. Smart Associates is the lead contractor working on behalf of the developer to complete the remaining work and correct deficiencies within the right-of-way. Construction commenced in March of 2023. |
||||||||||||||||||
Morningside Trunk Sanitary Sewer |
||||||||||||||||||
Current Phase: On-Hold Pending Region of Waterloo Environmental Assessment (EA)
Project Files:
|
||||||||||||||||||
Municipal Drain Maintenance and Capital Works |
||||||||||||||||||
|
||||||||||||||||||
New Hamburg to Baden Transmission Watermain |
||||||||||||||||||
Current Phase: Construction/Warranty Project Notes/Details: **Please Note: This is a Region of Waterloo Project, refer to their website for more information about Construction and Road Closures. |
||||||||||||||||||
Pavement Marking Program |
||||||||||||||||||
Current Phase: Construction Status: Scheduled Completion for October, 2023 Project Files: Work Extents Map |
||||||||||||||||||
Sidewalk Repair & Replacement |
||||||||||||||||||
Current Phase: Close-out / Warranty Project Files: |
||||||||||||||||||
Snyder’s Road East Reconstruction |
||||||||||||||||||
**Please Note: This is a Region of Waterloo Project, refer to their website for more information about Construction and Road Closures.
Current Phase: Construction Project Files: Phasing Maps |
||||||||||||||||||
Snyder’s Road West and Foundry Street Reconstruction |
||||||||||||||||||
Current Phase: Construction Notice to Residents/Business Owners Project Notes/Details: Reconstruction of Snyder's Road from Christian Street to Foundry Street, including:
Reconstruction of Foundry Street from Snyder's Road to Charles Street, including:
Project Files: |
||||||||||||||||||
Township Watermain Cured-in-Place Pipe (CIPP) Relining |
||||||||||||||||||
|
||||||||||||||||||
Victoria Street and Boullee Street Reconstruction |
||||||||||||||||||
Current Phase: Design Project Files:
Project Notes/Details: Engineering works for the reconstruction of Victoria Street (Hwy #7&8 to Boullee Street) and Boullee Street (Hamilton Road to Victoria Street) in New Hamburg has been delayed and will commence in Spring of 2025. Proposed improvements include reconstruction to an urban cross-section complete with new granular road base, asphalt surface, concrete curb and gutter, distribution and transmission watermain, storm sewer, sanitary sewer replacement and proposed sidewalk installation. These specific funds are associated with the coordination and installation of the Region’s transmission watermain, and coordination with the potential development on Boullee Street. |
||||||||||||||||||
Wilmot Street Reconstruction Phase 2 |
||||||||||||||||||
Current Phase: Close-out / Warranty
Project Files: Phasing Extents Map Project Notes/Details: Please note, Wilmot Street Reconstruction Stage 2 was scheduled for finalizing warranty works and was completed in 2023. Kirkpatrick Park will remain available by one entrance open at all times during the any construction works. Please contact Township of Wilmot’s Engineering Department for more information. Warranty period ends in December of 2023. |